The concept design was developed from several shorter span, with a precast pretension “Super-T” beam slab deck with spans up to 35m. The total structure length is 270m. There are dual two lane carriageways, 2m median, walkway and cycle track.The Seri Bakti is one of the main bridges spanning the protocol route. The bridge links the secondary road to the Deputy Prime Minister’s Residence, connecting the Government Presint in the north to Presint 16 in the south.

Seri Bakti Bridge - part of pedestrian lane along the decorative concrete shelters

Seri Bakti Bridge - green roof concrete shelter hanging on the bridge